22-562 -> 2 Alderson Court, Alliston ON - New Industrial Building 0
Please select the resources
Survey
Grading
HVAC
Trusses
Framing
Structural
Water Connection
ZCC
Grading Certf.
Assigned to:
VITOR LIMA
FERNANDO LIMA
RENATA MATTOS
JOSH FOSTER
ROSE ATIA
SUHAYB ARIF
TINA HUANG
DENA YOUSIF
TAHA EKINCI
DANIEL IBRAHIM
MARK BELCASTRO
ANTHONY
JESSICA EZEANO
AMNA MAJEED
GUEST LIMA ARCHITECTS
HITESH SHARMA
SALMA MAHGOUB
ALEJANDRO VERBEL
SONIA BHAUMIK
CLEITON MARQUES
DAVI SANTANA
ASHLEY DENISON
JOAO MOISES
CZESLAW HAWRYLUK
TOMAS MARTINS
CAIO BRAGA
PEDRO PAULO
PAULO LEMOS
LUCAS ANDRADE
HUDA AL-OBAIDI
JULIO SOUSA
RENATA ADMIN
MAYA NOWAK
Municipality
BURLINGTON
TORONTO
OAKVILLE
HAMILTON
MILTON
CAMBRIDGE
ST. CATHARINES
MISSISSAUGA
WATERDOWN
CALEDON
ANCASTER
THOROLD
Survey
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Survey Order:
Survey Receive
Grading
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Grading Order
Grading Receive
HVAC
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Mechanical Order
Mechanical Receive
Trusses
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Trusses Order
Trusses Receive
Trusses Stamped?
Framing
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Framing Order
Framing Receive
Framing Stamped?
Structural
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Structural Order
Structural Receive
ZCC
ZCC Applied
ZCC Approved
Grading Certificate
Engineering Applied
Engineering Approved
Water Connection
Halton Region Applied
Halton Region Approved
Notes
Project Notes
2022 06 14 Cleiton to work on this project 2022 06 22 Cleiton working site plan and floor plan 2022 06 27 Cleiton still working on site plan and floor plan 2022 07 04 Fernando to follow up 2022 07 12 Cleiton working on plans 2022 07 18 Cleiton to revise SPA drawings 2022 07 25 Client sent comments on drawings Davi to work on Revised drawings 2022 08 02 Arch drawings sent to client and other consultants for SPA Client is happy with Arch drawings 2022 08 09 Consultants reviewing Start building permit drawings - Salma 2022 08 15 Salma still working on building permit drawings - Has not started yet 2022 08 22 Sent to consultants for SPA drawings Salma to work in Building Permit Drawings 2022 08 30 Davi working with ENG for coordination 2022 09 06 Drawings were coordinated by Cleiton, needs to be sent to client for approval 2022 09 13 Salma still working on building permit drawings Building permit drawings to be sent to Struct Eng when complete Lighting Drawings Coordination by Cleiton and sent to the client and waiting to get approval 2022 09 19 Salma still working on building permit drawings 2022 10 31 - Salma to work on BP drawings 2022 11 07 - Same 2022 12 06 - Cleiton finished SPA revisions 2022 12 13 - Clients planner submitted for SPA 2023 02 13 - Waiting for revised site plan to address site plan comments that we received 2023 02 22 - Got comments from SPA - Waiting for revised site plan to address so that we can submit all at once. 2023 03 27 - We need to update Architectural Site Plan 2023 04 04 - Davi addressed SPA comments 2023 04 18 - Revisions for SPA have been sent to the client for Approval 2023 11 27 - Received new comments for SPA - Davi updated drawings - Davi sent revision drawings to planner for SPA resubmission 2023 12 18 - Salma made changes to the drawings - Fernando sent drawings to the planner 2024 05 27 - Received SPA Comments 2024 06 10 - Brad to work on working drawings as SPA comments were not for architectural. 2024 07 15 - Brad to relabel the northside and send to the planner 2024 07 22 - SPA submission was made by the planner last week. 2024 09 25 - client got verbal Site plan Approval. - Need to meet with client before we proceed. 2024 10 15 - Ready to proceed. - Waiting for Kick off meeting for Construction Drawings. 2024 10 28 - waiting for reply from consultants, fernando to follow up 2024 11 04 - Same 2024 11 18 - Client has retained consultants - Fernando to follow up with client on start dates 2024 11 27 - Rocco working on windows (consulting with Brad) - Working drawings started today 2024 12 10 - Same 2024 12 16 - elevation complete, drawings being sent to Rocco for final sign off 2025 01 06 - Brad working on wall sections - Rendering needed for sign (Lucas) 2025 01 20 - Wall sections to be completed (Brad) 2025 01 27 - Brad coordinating with consultant on working drawings - Going to try to have permit application drawings for this Thursday/Friday - Lucas completed renderings for Rocco & sent 2025 02 03 - Rocco looking for permit drawings - Brad working on window schedule 2025 02 10 . Brad working on permit set 2025 02 19 Working on drawings going to electric today - Permit by Friday 2025 03 24 - In for permit, Being reviewed by the city - 1.5 weeks to complete construction drawings 2025 04 01 - Fernando working on proposal 2025 04 08 - Drawings in for permit, no comments received - Lucas starting on marketing drawings 2025 04 28 - Waiting for city comments 2025 05 26: Waiting for permit comments. Waiting since march 7th Client is tendering components. Client asked to approve components, shop drawings for steel incoming. 2025 06 03 - BP received, no comments from city - we have structural steel, pre cast, miscellaneous metals, and stairs, shop drawings, (Brad to finish Wednesday) 2025 06 09 - Shop drawing reviews done for structural steel, precast, owsj, roof deck, stairs, and railings - curtain walls to be received next week 2025 06 18 - 2 additional shop drawings to be done today (precast re-submission & roof top units) 2025 06 23 - Huda working construction details - Shop drawings have been returned 2025 06 30 - Brad to review details Maya did - no new shop drawings from the client 2025 07 07 - Foundations started today - Brad to do markups for Huda or Maya to touch up 2025 07 14 - Need to issue IFC by Friday 2025 07 21 - Received shop drawings for windows on Friday (Fernando and Brad to review) - Brad to review Maya's drawings - drawings to be sent today