20-423 -> 97 Dartnall Hamilton - Business Park 0
Please select the resources
Survey
Grading
HVAC
Trusses
Framing
Structural
Water Connection
ZCC
Grading Certf.
Assigned to:
VITOR LIMA
FERNANDO LIMA
RENATA MATTOS
JOSH FOSTER
ROSE ATIA
SUHAYB ARIF
TINA HUANG
DENA YOUSIF
TAHA EKINCI
DANIEL IBRAHIM
MARK BELCASTRO
ANTHONY
JESSICA EZEANO
AMNA MAJEED
GUEST LIMA ARCHITECTS
HITESH SHARMA
SALMA MAHGOUB
ALEJANDRO VERBEL
SONIA BHAUMIK
CLEITON MARQUES
DAVI SANTANA
ASHLEY DENISON
JOAO MOISES
CZESLAW HAWRYLUK
TOMAS MARTINS
CAIO BRAGA
PEDRO PAULO
PAULO LEMOS
LUCAS ANDRADE
HUDA AL-OBAIDI
JULIO SOUSA
RENATA ADMIN
MAYA NOWAK
Municipality
BURLINGTON
TORONTO
OAKVILLE
HAMILTON
MILTON
CAMBRIDGE
ST. CATHARINES
MISSISSAUGA
WATERDOWN
CALEDON
ANCASTER
THOROLD
Survey
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Survey Order:
Survey Receive
Grading
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Grading Order
Grading Receive
HVAC
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Mechanical Order
Mechanical Receive
Trusses
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Trusses Order
Trusses Receive
Trusses Stamped?
Framing
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Framing Order
Framing Receive
Framing Stamped?
Structural
Company
N/A
GTA DESIGNS
RONA
LAND AND BUILDING EXPERTS
TRISTAR ENGINEERING
SEGUIN ENGINEERING
ARC ENGINEERING
ALSPEX BUILDING CONSULTANTS INC
CENTRIC ENGINEERING
URBAN IN MIND, PROFESSIONAL URBAN PLANNING, LAND DEVELOPMENT & CPTED CONSULTANTS
SEFERIAN DESIGN GROUP
YMSD CONSULTING
EGMOND ASSOCIATES LTD
BLACKWELL STRUCTURAL ENGINEERS
KALOS ENGINEERING INC.
JAIN SUSTAINABILITY CONSULTANTS INC.
TAIMOOR SHEIKH
CUNNINGHAM MCCONNELL LIMITED
GREATER TORONTO ACRES SURVEYING INC.
MATTHEWS, CAMERON HEYWOOD - KERRY T. HOWE SURVEYING LIMITED
A. J. CLARKE AND ASSOCIATES LTD.
TONY STAUSKAS
ANTHONY DIMICHELLE
MBTW GROUP
WILLOWHILL DESIGNS
Structural Order
Structural Receive
ZCC
ZCC Applied
ZCC Approved
Grading Certificate
Engineering Applied
Engineering Approved
Water Connection
Halton Region Applied
Halton Region Approved
Notes
Project Notes
-Rose to work on Dartnall -2020 11 09 Rose to start -2020 11 23 Waiting for Planner and Client feedback 2020 11 16 -Rose working on the site plan and road widening. -2020 12 07 -Waiting for Planner. Rose to send an email -2020 12 14 Waiting for response 2020 12 22 -Client approved the rendering -We need to resume work. waiting for Miles response. -Work on the elevations (Mark) new year 2021 01 04 Proceed with elevations based on renderings Mark to work on site plan to respond to email and elevations 2021 01 11 Mark working on the revised drawings 2021 01 25 Dwgs sent out to Client and AJ Clarke ( SPA) 2021 02 01 No changes. 2021 03 08 There are some comments from AJ Clarke. Some corrections and clarifications. Mark to take over. Mark and F to look at the revisions. 2021 03 15 Waiting for AJ Clarke 2021 03 22 same 2021 03 29 Summitted for SPA to AJ Clarke 2021 04 05 nothing 2021 04 12 applied for SPA 2021 04 19 Fernando to follow up 2021 04 27 Dartnall - Rose. Follow up with the project 2021 05 03 Applied for SPA. Waiting for comments 2021 05 10 same 2021 05 17 same 2021 09 20 meeting waiting for the date 2021 09 27 had meeting and revisions to be done by Rose 2021 10 13 received update plans sketch. Rose to work on the revised plan 2021 10 19 revised site plan today 2021 10 26 updated site plan sent to Client and Planner more revisions and waiting for confirmation R to send a follow up email if no hear 2021 11 16 Rose is completing revisions 2021 11 23 Rose tried to call Miles, but is in constant meetings and is not calling back. Rose to email him to find out what is happening 2021 11 30 Rose sent revised drawings to client and we are waiting a response 2021 12 06 Rose sent two options for the site plan to the client and the planner last week. Just waiting for them to respond Planner to talk to the city about the plans that were sent 2022 01 03 Nothing has been said by the planner so we are waiting to her back Rose to follow up 2022 01 10 Planner got back to us on what design we are going to go with and Rose is going to follow up on which steps next to take 2022 01 17 Rose followed up with the planner and he said he will do there work and let us know if he needs anything 2022 01 25 Rose followed up with the Planner to see if they need anything from us and they dont They are working on new site plan first 2022 01 31 Same 2022 01 09 Planner is submitting the new site plan 2022 02 16 Client wants to design the building modern style Fernando to go over and send renderings to client 2022 02 23 Sent exterior design to client and we are waiting to hear back from client with comments 2022 03 02 Salma to send drawings for SPA this morning 2022 03 14 Salma finished the modification for SPA 2022 03 21 Drawings sent for the planner for SPA Set drawings sent to Kevin for EIS Kevin requesting CAD drawings Salma to send CAD drawings to Kevin 2022 04 04 Just waiting to hear back 2022 05 09 Same 2022 05 16 Salma is working on 2022 05 24 Drawings have been sent to the planner 2022 05 30 Same 2022 06 06 Same 2022 07 18 Same 2022 10 25 Received comments from the planner and send back to the planner 2022 10 31 - Salma to address comments this week 2022 11 07 - Site plan approval comments sent to the planner 2022 11 15 - No updates 2022 11 21 - Salma to address comments from the planner and to sent directly after this meeting 2022 11 29 - Salma sent revised drawings to the planner for SPA submission 2022 12 13 - Same 2023 01 18 - Same 2023 01 24 - Same 2023 02 13 - Same 2023 02 22 - Same 2023 03 06 - Same 2023 06 19 - Same 2023 06 26 - Same 2023 08 01 - Markups received from the planner to proceed with the project. 2023 08 08 - Salma completed comments from the planner - Fernando to review before sending back to the planner. 2023 08 14 - Received comments from the planner - Comments completed by Salma and sent back to the planner 2023 08 21 - Renata to work on planner comments 2023 08 29 - Renata completed comments and sent to the planner (Rezoning application) 2023 09 18 - Received a signed site condition letter from AJ Clark and grading plan - Client requested the mechanical drawings from CK Engineering 2023 12 05 - To proceed with permit drawings - Salma was suppose to complete OBC drawings & matrix 2023 12 11 - Salma working on Matrix & Fire Plan & Section - Once completed send to Mechanical & Strucutral 2023 12 18 - Waiting for consultants drawings 2024 01 02 - Once we receive consultant drawings we will be proceeding with building permit drawings (SHELL ONLY) 2024 01 09 - Still waiting on Consultant drawings 2024 01 16 - Salma working on building permit set - Still waiting on consultant drawings 2024 02 05 _____________________SPA____________________ - Sent updated arch drawings to grading ___________________Building Permit___________________ - Salma working on building permit set - Received prelim sketch from structural - Markups sent to the structural engineer - Waiting on proper structural drawings to proceed 2024 02 15 - Feb 16th from the engineer we should receive Structural & Grading - Received M&E - DEADLINE FOR DRAWINGS FOR PERMIT IS MARCH 1ST!!!! (Building Permit Set) - DEADLINE FOR SALMA FEB 22ND!!!!!! (BUILDING PERMIT SET) 2024 02 20 - Received structural drawings - DEADLINE FOR DRAWINGS FOR PERMIT IS MARCH 1ST!!!! (Building Permit Set) - DEADLINE FOR SALMA FEB 22ND!!!!!! (BUILDING PERMIT SET) 2024 02 26 - Fernando to review drawings (Permit drawings that Salma completed) 2024 03 04 - Salma working on markups from Fernando - Markups MUST be sent to the engineer today. 2024 03 18 - Arch revised drawings sent to the structural engineer for approval - Site plan sent to the planner for coordination 2024 03 25 - Received updated grading and site servicing (Rose to review) - Online meeting today with all consultants 2024 04 01 - Tomas working on arch drawings and waiting on reference on the windows - Rose checking the references for the windows 2024 04 08 - So Architectural sent to the consultants - Need to check if we have to coordinate with structural, HVAC & Electrical - Tomas to work on window schedule - Ladder detail onto the roof & other typical details 2024 04 15 - Omar reached out about pushing through the Demolition permit. As well as a time line for building permit submission (Ashley and Rose explained about the city being shut down and that they will have to apply in person if they wish to proceed, however we are still trying to coordinate mechanical and structural drawings for spa approval. (Drawings sent last week to consultants) - Fernando to speak with Omar about Demo charges as it is not apart of the scope. 2024 04 30 - Received M&E&P - Tomas to coordinate Arch drawings (Rose to review when completed) 2024 05 06 - Same 2024 05 13 - Tomas to coordinate Arch drawings (Rose to review when completed) 2024 05 22 - Fernando to review arch drawings - Metric lighting being coordinating with arch dwgs 2024 05 27 - Fernando to review details. 2024 06 03 - Fernando to review details from Rose - Still waiting on SPA 2024 06 10 - Waiting on the client to respond if they want the stamped drawings. 2024 06 17 - BP drawings sent to the client last week - Client is waiting for the SPA before they can submit the BP. 2024 06 24 - Client requested to remove the Moloc system (Rose to email the client and explain we are not able to remove) - Rose revised the drawings (Additional Cost) and sent to the planner and the client. - Rose emailed the client about the additional costs before working. 2024 07 03 - Site plan has been updated and sent to the planner. 2024 08 07 - We received comments from the planner, Rose forwarded them to Tomas to address. They are minor comments. - Rose revised the location of the building on the site plan and sent the CAD to the planner because it was an urgent matter for the client (Omar). The rest of the comments need to be reviewed and addressed. 2024 09 09 - Plannar working on SPA to resubmit. - Rose to address Arch Comment. 2024 10 15 - Rose to follow up 2024 10 28 - Comments from city received - Rose reviewing 2024 11 04 - SPA comments to be reviewed by Rose 2024 11 11 - Rose addressed SPA and sent to planner, waiting to hear back from planner. 2025 01 20 - Zoning was not approved for lot - Waiting to hear back from client for how to proceed 2025 01 27 - Planner is working on garbage collection system 2025 02 19 - Planner submitting for MVA 2025 04 01 - Fernando to reach out to client for landscaping costs 2025 06 03 - Client asking for BP drawings, drawings will need to be updated if client can't find drawings sent last year 2025 06 09 - Client hasn't submitted for BP, need to update to new OBC - Client asked for revisions to the design, Rose to estimate time needed 2025 06 18 - Waiting for client to approve work for new OBC and design changes 2025 06 23 - Same - Meeting to be had today 2025 06 30 - Rose to send Fernando revised estimate for structure 2025 07 07 - Rose to send Fernando revised estimate for additional work (New OBC only) 2025 07 14 - Fernando to follow up with client 2025 07 21 - Rose to work on drawings update with new OBC